

Predict the future
INJECTION MOULDING
Our custom injection moulding services
Manufacture parts of all complexity levels, ranging in size from 3 mm (0.12 in) to 2 m (79 in), supported by flexible local and global production capabilities.
Lead times can be as short as 10 days, ensuring rapid turnaround without compromising quality.
Our manufacturing partners utilize 20 to 250 ton injection molding machines, selected based on part size, complexity, and production volume. DIN 16901-130 standards and tighter tolerances are available upon request to meet specific application requirements..




Prototyping
Ideal for rapid prototyping and low-volume production
Tool shot life – 1k to 100k units
Fast turnaround and cost-efficient construction
Aluminum or steel


Production
Longer-lasting tooling for larger volumes
Tool shot life – 100k to 1M units
Automated production for cost-efficiency at higher volumes
Hardened steel for longer life and a scalable unit price
Tooling - prototyping & production
Secondary operations
We offer several secondary operations such as painting or heat tapping inserts. You can specify which secondary operations are needed in the “custom requirements” part of your quote request. Here are some examples of secondary operations we provide:
Injection moulding materials
Injection moulding uses a huge range of plastics, making it ideal for many applications across nearly every industry.
We can source thousands of materials on request.
Please contact
Sales@rajaplasticsandendengg.com
Sales@primelinecomponents.com


Find out more about the timeline.Download our Gantt chart.
Injection moulding surface finishes
SPI surface finishes




We offer any type of SPI surface finish, such as A-1, D-2 or D-3.
VDI surface finishes
We offer any type of VDI surface finish, such as VDI28, VDI30 or VDI 33.
Gallery of plastic injection molded products






The injection molding timeline
Ready to start the injection molding process?
Download our Gantt chart to help keep your injection molding project on schedule, within budget and to spec.


CONTACT INFORMATION
All Rights Reserved © Primeline Components Pvt Ltd 2026 - Captain Lion Digital ®
sales@primelinecomponents.in
primelinecomponents@gmail.com
+919130303006 / +918956462142
GSTIN : 27ABNKPA7351L0
CIN : VU191191HJ910109


